Installation guide (overview)

Last updated: 17 Feb 2026

This guide is an **overview**. For electrical work, we recommend installation by a qualified professional.

**1. Pre-install checks**
- load profile and required power (kW),
- grid type (single/three-phase),
- equipment location (ventilation, temperature),
- component compatibility.

**2. Mounting & panels**
Install the mounting structure according to specifications. Follow tilt, fastening points and spacing. Tighten to the recommended torque.

**3. DC wiring & protections**
Use proper solar cable, correct connectors and protections (fuses/breakers, SPD). Avoid reverse polarity.

**4. Inverter & batteries**
Mount the inverter on a solid wall with adequate cooling space. For batteries, follow the manufacturer’s instructions (BMS, cabling, fusing, temperature range).

**5. AC connection**
Connect to the electrical panel correctly (wire gauges, protections, grounding). Local grid requirements may apply.

**6. Commissioning**
Configure inverter settings (grid, battery, modes). Verify voltages/currents, check errors, perform a functional test.

**7. Maintenance**
Periodically inspect connections, cables and protections; clean panels when needed.